Fasteq's
Bill of Materials application is a flexible system designed for
companies that assemble finished goods and manufacture most of
the components. It provides unlimited levels of material usage
and has features that calculate material, direct, and overhead
labour costs.
Fasteq can control
engineering change orders with ease. We enter them in advance of
the change and let the effective date determine when to place
them into the customer's required date. Full change order
history is available and we can provide reports showing only the
current requirements or a full history of all change orders
including any obsolescence.
Our Bill of Material Reports
shows the following information: